Free 30-Minute Consultation for Utility Engineering and Joint-Use Teams.
BEAD broadband expansion, data center growth, and grid modernization are increasing pole attachment requests across the country.
Collaborative Synergy helps public and investor-owned utilities, electric cooperatives, and municipalities manage the engineering workload behind those requests through pole analysis, field documentation, and scalable engineering support.
Speak with a Collaborative Synergy engineer about upcoming attachment workloads and how utilities can prepare for increased permit review activity.
Utility and electric cooperative teams only. No obligation. No project commitment required.
Broadband expansion is only one driver of increased pole attachment activity. Utilities are also supporting critical national initiatives:
Supporting the exponential growth of digital infrastructure and power requirements.
Upgrading legacy systems for a smarter, more resilient energy future.
Deploying charging networks to meet the surge in electric vehicle adoption.
Expanding 5G and fiber-to-the-home connectivity across regions.
Collaborative Synergy supports utility engineering and joint-use teams with the technical work required to evaluate attachment requests.
Engineering calculations aligned with NESC standards and
utility-specific standards, which often exceed NESC requirements, to determine whether poles can safely support proposed attachments.
Identification of transfers, reinforcements, or pole replacements required before approval.
Engineering documentation prepared according to each utility's review standards.
Additional engineering support when attachment applications increase.
Accurate field data and first-pass engineering help reduce permit rejections and minimize back-and-forth between utilities and attachers.
Prepare Your Utility for Increased Attachment Reviews
Start a conversation with a Collaborative Synergy engineer and prepare your team for increased permit review activity.
